HOME OUR BOARD COVENANTS/BY-LAWS ARC
COMMUNITY/RESOURCES

CONSTRUCTION

Architectural Review Committee
Tom Remick, Committee Chair - t_remick@hotmail.com
Barbara Brillbart, Vice-chair - babrillhart@sc.rr.com
Cal Cruz - cruz@teoaweb.com
Tom Williams - Tom@glass24-7.com
Paul Thomas - pthomas62@att.net.
Derrick Peake, Architect - dpeake@pbtcomm.net

The purpose of the ARC is to define design standards of construction in Timberlake Estates and to review and either approve or disapprove any and all proposed improvements for a building site within Timberlake Estates including but not limited to: dwellings, garages, outbuildings or any other buildings, construction or installation of sidewalks, driveways, parking lots, mail boxes, decks, patios, courtyards, swimming pools, tennis courts, outdoor athletic equipment, greenhouses, playhouses, awnings, walls, fences, satellite dishes, docks, wharves, rip-rap, bulkheads, boat slips and lifts, exterior lights, any exterior addition to, change, or alteration to existing structures, including without limitation painting or staining of any exterior surface. ARC approval must be obtained for dredging and fill operations, shaping of land areas and drainage, and removal of any trees more than six (6) inches in diameter measured at a height of four (4) feet from the base. 
                                                                             
                                                                                

To view and/or download the
ARC Guidelines, Operating Procedures or Application Package click on the links below:


ARC Guidelines
(PDF)

ARC Operating Procedures (PDF)

Application (PDF)
Package


ARC Reports:
  January 2012
  December 2011
  November 2011
  September 2011
  August 2011
  July 2011
  June2011
  May2011
  April 2011
  March 2011
  February 2011
  January 2011
  December 2010
  November 2010
  September 2010
  August 2010
  July 2010
  June 2010
  May 2010
  April 2010
  March 2010
  February 2010
  January 2010